No data loaded as v0.2
Macro view

Dashboard

Total orders
In the system
In production
Active at a station
Late
Past ship date
Urgent
Marked urgent
Production funnel
Click a stage to jump there
New
Waiting stock
Rip
Molder
Chop
Packing

Bottleneck alerts will appear here

Stages where orders have been waiting more than 5 days, plus orders blocked because raw material needs to be ordered. The list is empty until orders are imported.

Master order list

Orders

Drop Excel files here, or click to browse
Special Order Tracking, Molder List, Chop Saws, Rip List, Raw Material Inventory, Rip Inventory. Files are read in your browser and never uploaded anywhere.

The board will appear here once you import a file

Cards or table view, filterable by stage / priority / customer / ship-by date, with inline editing for status, priority, assigned station, and notes. Coming in checkpoint 3.

Stage 1 — Stock list

Raw Material Inventory

Lumber on hand

Grouped by species → thickness → length, with rollup totals in board feet. Filter by vendor, grade, available-to-use, called-to-rip. Per-pack detail with pack number, received date, value on hand, vendor PO. Coming in checkpoint 3.

Stage 2 — Work queue

Rip List

Rip jobs queued at the Parsons and Hendricks lines

Each row shows the target rip SKU, the raw pack being consumed, target linear feet, priority, expected completion. "Mark complete" advances the order to the molder stage and moves the produced LNFT into Rip Inventory.

Stage 3 — Stock list

Rip Inventory

Ripped stock on hand

Grouped by SKU → length, with linear-foot rollups. Per-pack detail with pack number, source raw pack, produced date, value on hand. "Log new rip" lets operators record rips from the queue. "Allocate to order" reserves packs for an order.

Stage 4 — Work queue

Molder List

Orders queued at the molders

Grouped by station (Molder 1, 2, 3, 4). Each row shows the order, SKU, profile, allocated rip stock, expected completion. "Mark complete" advances the order to the chop saw and consumes the rip pack's LNFT.

Stage 5 — Work queue

Chop Saw List

Orders queued at the chop saws

Grouped by Chop Saw 1 and Chop Saw 2. Each row shows the order, target lengths, target pieces, profile from the molder. "Mark complete" advances the order to Packing.

Stage 6 — Pack & ship

Packing

Orders ready to be packed and shipped

Generates the same labels the Packing Generator file produces today. "Ship" advances the order to SHIPPED and removes it from active queues.